Wall enforcement procedure welded mesh structure details that includes a detailed view of perforations in the masonry with a chisel of ¼ "each 45 cm (three times the distance between the knots of the mesh with cocada of 15 cm). immediately these perforations clean them with compressed air., Drill holes with drill, finally, tarrajea the wall with a mortar that has a relation cement-fine sand 1: 4., then the perforations will be plugged with a mortar slurry having a cement-fine sand ratio of 1: 3. and much more of wall details.