Xingke Technology Development Investment Co., Ltd.. Floor plan, All are 100X50 metal trunking., Installation at 0.5m from the highest and lowest points of the htway, One single phase is set at 0.5m from the car roof and 0.5m from the pit, Second, three-pole combination socket.