This Architectural Drawing is of Bereuter Details for Ventilation in a Sheltered Substation for Fire Protection. Fire ventilation is vertical when exhaust opening is located higher than the fire and fire gases flow upwards (vertically) out of the building. Exhaust opening should be located higher as possible in the building. In this Drawing, the detail is mention for exhaust opening. For more details and information download the drawing file.