Wall with high window, Bathroom for Employee, Machine Room, no piping should be covered before passing the hydrostatic or pneumatic test; to cover it the authorization will be obtained in writing of mexican petroleums.
Download Steel Structure A
Gym front view and roof de
Roof plan of first level f
Geographic location of tow
detail 8 cantiliver roof
Section with different axi
Canteen section, plan, con
This AutoCAD drawing file
Wall expansion joint deta
Playground Layout Plan In
The stadium layout section
Tank detail separated in t