Wall with high window, Bathroom for Employee, Machine Room, no piping should be covered before passing the hydrostatic or pneumatic test; to cover it the authorization will be obtained in writing of mexican petroleums.
Floor plan with architectu
Detail of the distribution
Pave details
Enterprise plan of two lev
Architectural view of fitn
AutoCAD 2D file of compres
Production detail of tower
manual car barrier
Interior Lay-out Detail
Plinth dwg file
Roof Framing Plan Details
Architectural detail view