Wall with high window, Bathroom for Employee, Machine Room, no piping should be covered before passing the hydrostatic or pneumatic test; to cover it the authorization will be obtained in writing of mexican petroleums.
Balcony side elevation det
Details of the typical con
Imprints dwg file
Dome construction details
Metal cartel design cad dr
Second-floor plan of the A
Inclined roof detail
Corporate elevation view i
Reception hall details in
Ceiling plan detail dwg fi
Block of acultacin of the
AutoCAD 2D drawing of air