Geological cutting surface Section detail, Mold belt ∅20a: 2000 Put inside and link welded to steel holder, 1,400 elevations hit the top of the pile, clay mixed with sand and laterite, laterite and sandy clay, Child listed concrete 4 a: 2000 etc.
Proposed layout for riyadh
Tavan false ceiling detail
Design of ground floor pla
Wooden template roof and c
Reception counter rear wal
Plan design details for a
Detail of wall common chec
Tower detail of module has
Tilt window sliding parall
2d CAD structural joints a
House foundation plan, cov
Continuous roof with metal