Pile cap details with pile cap section 500mm dia of pile with rod details double valve pile section pile height 10000mm. slump of concrete = 175mm to 200mm to ensure smooth flow of concrete through a tremie pipe of not less than 200mm diameter. plasticizer from fosroc/stp/sikka may be mixed with concrete. bentonite (drilling mud) solution shall be recirculated while drilling.