Excavation of Unsuitable Material, Filling for Top soiling (Separator), - All dimension and elevation are meters. - Filling for Top soiling with 35cm thickness.
Wooden Bridge
Detail road structural pla
Bridge Structure Detail
Front Elevation of an indu
Armor false bridge section
Concrete Bridge
Structure Bridge Detail
Detail of Bridge
Elevation of Inlet Pipe CA
Steel bridge section and p
Bridge Concrete design
Design of Bridge Structure