see detail of ramp, Tunnel containing the inlet Of the ventilation system pipes for the Frozen storage chamber. Extension of 60 cm angle of 3 "x 1/4" To be able to weld there the stops For the trailers.
Detail view of attachments
Stilt +9 of the hotel bui
Left side interior section
The back side section view
A cut section view of the
Pavement construction draw
Left side structure sectio
Water Line & Drainage deta
Cross-section of the culve
Precast concrete flight st
G+18 High tower Building d
Detail terrace Steel Bar