Three-layer structure floor Construction plan, Unspecified beam top elevations are 11.110m., Indicates that the steel beam is hinged to the connected beam. The remaining unspecified beam-column and beam-to-beam connections are just connected.
A detail drawing of water
Top floor formwork details
Foundation sectional detai
Warehouse roof section det
Different sections of foot
Fence railing type section
Construction Section Desig
Seal board and wall joint
Compact school building st
Construction and installat
Office development doors a
Cross section of ramp with